Turnkey roof installation: metal tiles, soft, folded, corrugated board. Collected on NATUMBE.KZ0 listingstrusted crews and roofers with a guarantee.
Kazakhstan has a harsh climate: snow loads up to 250 kg/m2, summer heat, sudden fluctuations. The safety of the whole house depends on the quality of the roof.
A roof is not just a covering on top. This is a complex engineering system: rafter system, insulation, vapor barrier, hydro-wind protection, ventilation gaps, roofing, gutter, snow holders. An error at any level is leaks, condensation, rotting of the rafters, freezing, ice jams in winter.
Collected on NATUMBE.KZ0 listingsads from trusted roofers and crews {region.in }, which specialize specifically in the installation of roofs. They will take over the entire cycle: from the design of the rafter system to the final installation of the drains. And you will get a roof that will last 30-50+ years without leaks and alterations.
9 main directions that are ordered most often in {region.in }
The base of the entire roof. The quality of the rafters depends on whether the roof can withstand the snow loads of Kazakhstan.
The most popular material in Kazakhstan. Lightweight, durable, a huge selection of colors and profiles.
Quiet, beautiful, maintainable. It is ideal for roofs of complex shapes with multiple ends.
Premium solution. Perfectly smooth, the snow melts instantly. Copper, zinc-titanium, galvanized steel.
It is critical for attics and residential attics. The right "pie" is the key to the absence of condensation.
Divert water from the facade and foundation. Without a drain, the foundation collapses in 5-7 years.
THEY ARE MANDATORY in Kazakhstan. They protect against avalanches that can injure people.
Light in the under-roof space. Velux, Fakro, Roto. Installation in the roof plane is a difficult job.
Elimination of leaks, replacement of damaged sheets, cleaning of drains, treatment of moss.
Each has its own pros, cons, and optimal application area. The choice depends on the slope, budget and architecture of the house.
Glass wool + bitumen + basalt chips. Silent, beautiful, maintainable (one shingle is replaced).
Copper, zinc, titanium or steel. The paintings are joined by a double fold. It has been serving for 80-150 years. Status selection.
Galvanized steel with polymer. Easy installation, low price. It is popular for household buildings and budget homes.
Natural baked clay. Classics for the ages. It requires reinforced rafters due to its heavy weight.
Bitumen wavy sheets. Lightweight, low-cost, easy to install. For farm buildings, canopies, and summer houses.
Forprivate houses in Kazakhstanwith a pitched roof —metal roof(optimal in terms of price/quality) orsoft roof tiles(if silence and the complex shape of the roof are important). Forpremium homes — folding copperorceramicroof tiles. Forhousehold buildings— corrugated board or ondulin. Forflat roofs— PVC/TPO membranes (not included in this review). Be sure to considerThe snow districtyour region (Kazakhstan — III-V) when selecting and calculating the rafter system.
6 mandatory layers from bottom to top. Absence of any = condensation, rot, mold
Current prices {region.in } taking into account materials and works. For a house of 100 m2, the roof area is ~130 m2, including overhangs
| Service | Specifications | Price | Term |
|---|---|---|---|
| Rafter system | |||
| Gable roof (simple)top | Timber 50×150, pitch 600 mm | 5 000 — 8 000 ₸/m2 | 5-8 days |
| Hip roof | With sloping rafters, diagonals | 7 000 — 11 000 ₸/m2 | 8-14 days |
| The attic polyline | Reinforced, with posts, crossbars | 8 000 — 12 000 ₸/m2 | 10-18 days |
| A Mauerlat with a mount | 150×150 timber, anchors to the armature | 2 500 — 4 500 ₸/M.P. | 1-2 days |
| Roofing (turnkey) | |||
| Metal rooftop | 0.5mm steel, polyester, crate | 6 000 — 10 000 ₸/m2 | 7-14 days |
| Premium metal tiles | Pural/PVDF, 0.5mm thick | 9 000 — 14 000 ₸/m2 | 7-14 days |
| Composite roof tiles | Steel + basalt chips (Gerard) | 14 000 — 22 000 ₸/m2 | 10-18 days |
| Soft roof tilestop | Shinglas/Tegola + OSB-3 + carpet | 7 000 — 12 000 ₸/m2 | 10-18 days |
| Premium soft roof tiles | Katepal, multi-layered, 60 years warranty | 12 000 — 18 000 ₸/m2 | 10-18 days |
| Steel folding roof | Galvanizing with polymer, double fold | 12 000 — 20 000 ₸/m2 | Days 14-21 |
| Folding copper | Copper 0.6-0.7 mm, patina over time | 25 000 — 40 000 ₸/m2 | 21-40 days |
| Folding zinc-titanium | Rheinzink, 80+ years of service | 22 000 — 35 000 ₸/m2 | 21-40 days |
| Profiled flooring | C8, C20, HC35 with polymer | 4 500 — 7 500 ₸/m2 | 5-10 days |
| Ondulin | Bitumen sheets, 4 colors | 4 000 — 6 500 ₸/m2 | 4-8 days |
| Ceramic tiles | Braas, Creaton, reinforced rafters | 18 000 — 32 000 ₸/m2 | 21-35 days |
| Insulation and insulation | |||
| Insulation with mineral wool 200 mmtop | Rockwool Light Butts, 2 layers | 4 000 — 6 500 ₸/m2 | 2-4 days |
| Insulation with mineral wool 300 mm | For attics, 3 layers apart | 5 500 — 8 500 ₸/m2 | 3-5 days |
| PIR plates (premium) | Thermal conductivity is 2 times lower than mineral wool | 8 000 — 14 000 ₸/m2 | 2-4 days |
| Vapor barrier with sizing | Isospan B, Delta, adhesive tape for seams | 800 — 1,500 ₸/m2 | 1 day |
| Superdiffusion membrane | Isospan A, Tyvek, Delta | 600 — 1,200 ₸/m2 | 1 day |
| Drains and finishing elements | |||
| PVC Drain (Docke)top | Gutters, pipes, funnels, corners | 3 500 — 6 000 ₸/M.P. | 1-2 days |
| Metal drain | Steel with polymer 0.6 mm | 5 000 — 8 500 ₸/M.P. | 1-2 days |
| The drain is copper | Premium, patina over time | 10 000 — 18 000 ₸/M.P. | 2-3 days |
| Ridge, endowment, cornice | Finishing elements with a seal | 1 500 — 3 500 ₸/M.P. | included in the installation |
| Filing of overhangs (spotlights) | Vinyl or metal | 4 000 — 8 000 ₸/m2 | 2-4 days |
| Additional elements | |||
| The snow holder is tubularnecessarily | 3 m section, with brackets | 8 000 — 18 000 ,/piece | 0.5 days |
| Latticed snow holder | For a soft roof, section 3 m | 12 000 — 25 000 ,/piece | 0.5 days |
| Fakro skylight | 66×118 cm, with salary, installation | 150 000 — 280 000 ₸ | 1 day |
| Velux skylight | Premium, with electric drive | 280 000 — 500 000 ₸ | 1 day |
| De-icing (cable) | Heating cable in the gutters | 15 000 — 30 000 ₸/M.P. | 1-2 days |
| Exit to the roof (stairs) | For maintenance, snow retention | 45 000 — 90 000 ₸ | 0.5 days |
| Repair and maintenance | |||
| Thermal imaging diagnostics | Search for leaks, cold bridges | 15 000 — 30 000 ₸ | 1-2 hours |
| Local leak repair | Sheet replacement, sealing | 20 000 — 60 000 ₸ | 0.5-1 day |
| Cleaning of drains | Foliage, dirt, Slope check | 15 000 — 35 000 ₸ | 2-4 hours |
| Moss treatment | Special chemicals, washing | 1 500 — 3 000 ₸/m2 | 1 day |
The technological process consists of 8 stages. The right sequence = a roof for 50 years without problems
The master goes to the facility, makesaccurate measurementsUsing a laser rangefinder, it detects the snow area and wind load. Discusses with you the type of coating, color, additional options (skylights, snow holders). Makes a draft of the rafter system with the calculation of sections.
1-2 days · free of chargeIt is compiled within 2-3 daysdetailed estimatebroken down: materials (including brands — Rockwool, Fakro, Ruukki), fasteners, work, delivery. An agreement is concluded withwarranty obligations(3-10 years), in time, and in stages of payment. For complex projects, 3D visualization is done.
2-3 daysThe team purchases materials from authorized dealers.Be sure to check: the thickness of the steel, the availability of certificates, the integrity of the packaging. You receive product receipts — complete transparency. Prepayment of 30-40% for materials. Delivery by the manipulator to the object.
3-7 daysInstallation of the mauerlat on the armopoyas (anchors). Installation of rafters withwith a calculated step of 600 mmunder the insulation. Installation of racks, crossbars, girders. Reinforcement for attics. Photo report of hidden works. All wooden elements are treated with fire protection.
5-14 daysSuperdiffusion membrane installationThe right side up(the marking is visible). Overlap of 15 cm, gluing of seams. Installation of a 50x50 mm counter-grid to create a ventilation gap. This is a critical stage — without it, the roof will rot in 5 years.
2-3 daysFor metal tiles —a 30×100 crate with a 350 mm pitch(under the wave). For soft — solid OSB-3 12 mm. Laying insulation between the rafters (200-300 mm) in a gap. Installation of a vapor barrier from the inside with gluing of seams with a special adhesive tape.
3-5 daysLaying the roofing from bottom to top.Mounting according to the manufacturer's instructions: for metal tiles — in the lower wave with an EPDM washer. Installation of skates, ends, cornice strips. Installation of snow holders in 1-2 rows. Installation of skylights.
Day 7-21Installation of a drainage system with a slope3-5 mm per meter. Filing of overhangs with soffits with perforations (for ventilation). Cleaning of the facility. Final check: slope, tightness, ventilation operation, snow holders. Signing the act, handing over the warranty card.
3-5 daysMetal tiles, soft roofing and folding — what should I choose for your task?
Quiet, beautiful, maintainable. The best choice for complex roofs with endings.
Ideal for:attics, complicated roofs, and neighborhoods with noisy neighbors.
A premium solution for high-status homes. Copper has been used for more than 100 years and is covered with a patina.
Ideal for:premium houses, historical buildings, and folding traditions.
6 Proven Criteria that will Protect You from Leaks, Freezing, and Alterations
Demandphotos of real roofs— not only beautiful 3D renderers. Photos of hidden works are especially important.: rafters, membranes, insulation. Ask for 2-3 addresses that can be viewed live. An experienced roofer will easily show his facilities and give contacts of former clients.
Study customer reviews from {region.in }. Look for mentions oftiming, absence of leaks after a year, quality of drains. A team with 30+ reviews and a rating of 4.8+ is a reliable choice. Be wary of complaints about "leaks after the first winter" or "condensation in the attic" — this is a sign of a violation of technology.
The professional providesdetailed estimatewith manufacturers indicated: Rockwool Light Butts, Fakro FT-V, Ruukki Monterrey, Izospan A. "Eye price" or "our materials" is a red flag. Demand receipts from construction bases — full transparency of purchases.
From a good teama complete set of tools: laser level, rangefinder, Makita/DeWalt screwdrivers, miter saw, folding machine (for folding roofing), thermal imager for diagnostics. If the "brigade" only has a hammer and a saw, they are not professionals.
Ask 3 questions:"What is the pitch of the rafters for insulation 200 mm?"(correct — 600 mm)."How much is the ventilation gap?"(50 mm minimum)."Do I need to glue the vapor barrier?"(always with a special adhesive tape). A professional answers confidently with technical details, an amateur answers with general phrases.
A self-respecting brigade gives5-10 years warrantyfor installation work and transfers the manufacturer's warranty for materials (up to 50 years). If leaks, condensation, or other problems appear during the warranty period, the repair is free of charge. The guarantee must be specified in the contract with specific conditions.
Cheap = thin rafters, no membranes, savings on snow holders. The result is leaks and condensation after 1-2 years.
A real turnkey roof of 130 m2 is a minimum of 25-40 days. Insulation, membranes, and drains take time. Rush = technology disruption.
Normally - 30-40% on materials by stages. A full prepayment in advance is a sign of fraud. Money ahead = high risk.
After laying the coating, you will not see the rafters, membranes, insulation. Professionals MAKE SURE to take a photo report of all the hidden stages. If they don't, what are they hiding?
If they write "it started leaking after the first winter" or "condensation in the attic", this is a systemic violation of technology (the membrane is upside down, there is no vent, the vapor barrier is not glued). Run away from such a brigade.
The team thatat the same time, he makes foundations, walls, roofing, electrics and plumbing— there can be no pros in any direction. The roof isnarrow specializationwith its own technology, tools and experience: calculation of rafters, working with membranes, knowledge of snow retention, installation of a seam. Look for a team that specializes inIt is on the roofs. Narrow specialization = high quality. Generalists = average result in everything.
Knowing the peaks of the season will help you save 15-25% on large projects.
The start of the season.Many are starting construction. Queues are 1-3 weeks long. Prices are starting to rise. It's a good time for rafters and insulation.
Peak season.Perfect weather for all jobs. The prices are maximum, the record is 2-4 weeks in advance. The teams are scheduled for months ahead.
An emergency.Everyone is in a hurry to close the roof before the frost. The prices are high, the crews are overloaded. Risks due to rains.
Discounts of 15-25%.The rafter system and insulation are installed all year round.The perfect strategy:you order a project at a discount in winter, make rafters and insulation, and roofing in the spring. Saving on a house of 130 m2 —300 000-600 000 ₸. Plus, no queues and no attention from the crew.
Can:installation of a rafter system (up to -15°C), installation of insulation, vapor barrier, membranes, crates.Must not:soft tiles (only +5°C and above), installation of metal tiles at -15°C (becomes brittle), bitumen work.Plan ahead!
Expert answers to the most popular questions from residents {region.in }
In 2026, for a house of 100 m2 (roof area ~130 m2, including overhangs):turnkey metal tiles — 1 500 000-2 400 000 ₸, soft roof tiles— 1 800 000-2 900 000 ₸ (taking into account the OSB base),folding copper — 3 200 000-5 500 000 ₸, profiled flooring— 1 100 000-1 800 000 ₸. The price includes: rafter system, 200 mm insulation, hydro-vapor barrier, roofing, gutters, overhang lining, snow holders. Foratticsadd 40-60% due to the insulation of 300 mm and skylights.
Kazakhstan belongs toIII-V snow regions(140-250 kg/m2). The optimal choice:1) Metal roofwith a slope of 14° — snow melts well, lasts 30-50 years, the price is 6 000-12 000 ₸/m2.2) Folding steel roof— perfectly smooth, snow melts instantly, lasts for 50+ years.3) Soft roof tiles— quiet, but requires mandatory snow holders. Forflat roofs— only PVC/TPO membrane roofing with a slope of 2°.Ceramic tilesIt is too heavy (50 kg/m2) and requires reinforced rafters, which increases the cost of the project by 20-30%.
Metal roof:0.45-0.5 mm polymer-coated steel, service life 30-50 years, price 6 000-12 000 ₸/m2, noisy during rain (sound insulation is needed), light (4-5 kg/m2), snow avalanches (snow holders are needed), quickly mounted.Soft (bitumen) roof tiles:glass wool with bitumen and basalt chips, service life 30-60 years, price 7 000-15 000 ₸/m2,quiet, snow stays on a rough surface, requires a solid base of OSB-3 (additional 1,500-2,500 ₸/m2),maintainable(one shingle is being replaced). For attics and complex roofs — soft. For simple sloping ones — metal tiles.
In Kazakhstan —MANDATORY for all pitched roofs. Snow masses of 100-250 kg/m2 may occur during an avalanche.:injure people, damage parked cars, tear off drains, break through the soft roof at the bottom of the ramp, destroy outbuildings. There are snow holders:tubular(8,000-18,000 ₸ for the 3rd section),latticed(12,000-25,000 ₸, for a soft roof),yoke(dotted, for long ramps). They are installed in 1-2 rows along the ramp +always above the skylights, the front door, the parking lot. Savings on snow holders = millions in damage risk and criminal liability in case of injury.
For a house of 100 m2 (roof ~130 m2):rafter system— 5-14 days,insulation and insulation— 3-5 days,installation of the coating— 7-14 days (metal tile / soft), 14-21 days (folded).Drainage system— 2-3 days,filing of overhangs— 2-4 days. Total turnkey:25-40 days for metal tiles, 30-45 days for mild,40-60 days for folding. A team of 4-6 people works faster. Deadlines increase in rainy weather — installation in the rain is prohibited.Plan ahead 30-50%.%for unexpected delays.
Standard guarantees:for installation work— 3-7 years old,for metal tiles (manufacturer)— 15-50 years, depending on the coating (polyester, pural, PVDF),on soft tiles— 20-60 years old (Tegola, Shinglas, Katepal),for folded copper— 100+ years old,on the drains— 5-15 years old. Honest contractors provide a 5-10-year TURNKEY GUARANTEE for the entire structure.Important points:the warranty is void if the antennas/snow holders are installed independently (the coating is damaged), if there is no ventilation of the under-roof space, or if the slope is violated. Request a stamped warranty card with a list of conditions.
The rafter systemit can be mounted all year round (the tree is not afraid of frost).Roofing— at temperatures above +5°C.Soft roof tilesrequires a minimum of +5°C (otherwise bitumen will not stick).Metal roofit is mounted up to -15°C.Peak season:May-October, maximum prices, record in 2-4 weeks.Winter (December-February)— discounts of 15-25%, you can order rafters and insulation, and the coating is available in spring. The perfect strategy:discounted winter order, spring installation. Saving on a house of 100 m2 —250 000-500 000 ₸.
The roofing pie ismulti-layered construction. From bottom to top:1)Vapor barrier (membrane on the side of the room, protects the insulation from moisture from the house).2)Insulation (mineral wool 200-300 mm, PIR-plates for attics).3)Hydro-windproof superdiffusion membrane (releases steam, but does not let water in).4)A 50x50 mm counter-grid (creates a vent gap).5)Crate (350 mm pitch for metal tiles, solid OSB for soft ones).6)Roofing.Absence of any layer= condensation, rotting of the rafters, mold, freezing. This is the most important part of the roof that you cannot see after the work is completed, so require a photo report of the hidden stages.
The attic isliving space under the roof that requires a special approach:1)Insulation of 250-300 mm (instead of 200 mm for a cold attic) — Rockwool Light Butts mineral wool or PIR plates.2)Vapor barrier withgluing seams with special adhesive tape(otherwise, condensation).3)Velux/Fakro skylights — installation in the roof plane (from 150,000 to 500,000 rubles with work).4)Sound insulation (especially for metal tiles) — an additional 50 mm minvata.5)Reinforced rafters (section 50×200 instead of 50×150).The cost of a mansard roof is 40-60% higher than usual.% but it gives a full-fledged living space instead of an attic.
7 acceptance points: 1)Check the slope with an incline meter (must match the design).2)Inspect itthe endowments— the most vulnerable areas should have a double layer of waterproofing.3)Check the fastening of the sheets — the self-tapping screws in the lower wave, with the EPDM gasket, are not tightened (otherwise the elastic band is damaged).4) The horseit must have a ventilation gap and a seal.5)Cornice overhang — 50-70 mm, with a drip.6)Drain — slope 3-5 mm per meter, sealed joints.7)Check the under—roof space - it's dry, non-condensing, and the ventilation is working.Request a photo report of hidden works(rafters, membranes) BEFORE laying the coating.
Without sound insulation —YES, very much. Drops on metal create a "drumming effect". The solution is a roofing pie with proper insulation:Minvata is 200 mm between the rafters + 50 mm crosswise from the bottom. This provides 45-50 dB sound insulation — rain is almost inaudible. Additional sound insulation is recommended for attic floors. There are also special metal roof profiles with a noise-absorbing coating (Ruukki Classic Click with anti-condensation feltAn alternative for complete silence is soft tiles (bitumen + basalt dampen the sound).
REQUIRED.Without ventilation: condensation on the inside of the coating → rotting of the rafters, mold, destruction of insulation, metal corrosion. Ventilation system:1)Ventilation gap of 50 mm between the membrane and the coating (created by a 50x50 mm counter-lattice).2)Cornice spotlights with perforation — air supply from below.3) Skate aerators or deflectors— hood on top.4)Dormer windows for attics. Calculation: 1/300 of the ramp area for inflow and exhaust.Without ventilation, the roof will fail in 5-7 years instead of the required 30-50.This is the most common mistake of cheap brigades.
Real stories of homeowners who found their crew on NATUMBE.KZ
"The house is 120 m2, with a gable roof of 155 m2. Metal tile Ruukki Monterrey pural, color RAL 8017. Team with NATUMBE.KZ, rating 4.9. Completed in 28 days: rafters, 250 mm insulation, membranes, coating, Doke gutters, tubular snow holders in 2 rows. 1,850,000 ₸ turnkey. Three winters — not a single leak!"
"The mansard roof is 180 m2 with a broken slope. Shinglas Canyon soft roof tiles, 3 Velux skylights, insulation with 300 mm PIR-plates. 2,900,000 ₸, 45 days of operation. The attic is quiet, warm in winter, and you can't hear the rain at all. Amazing quality!"
"A folded copper roof for a house of 200 m2. This is a premium payment made for 2 months, 4,200,000 ₸. 0.7mm copper, double fold, all nodes are perfect. 3 years have passed — it has become covered with a beautiful patina, the neighbors admire it. A 25-year warranty from the team."
"I ordered it in winter with a 20% discount — the rafters and insulation were made in January, and the metal roof was covered in April. Saved 450,000 ₸! The team worked calmly, without an emergency. A photo report of hidden works is required. I recommend the winter strategy!"
"The repair of the old roof was leaking in 3 places. The team with NATUMBE.KZ diagnosed with a thermal imager, found problems in the ends and a non-glued vapor barrier. Everything was fixed in 5 days. 185 000 ₸. No more condensation in winter! Professionals."
"Hip roof of 140 m2 with ceramic tiles Braas. Reinforced rafters 50x200, 500 mm pitch. 3,800,000 ₸ in 35 days. Heavy, beautiful, eternal. The neighbors ask for the brigade's contacts — now I recommend it to everyone!"
0 listings of verified roofers {region.in }. Metal tiles, soft, folded, corrugated. Free measurement and 3D project. The warranty is 5-10 years.