Bar installation ETs - 1600. Trencher
№172964 Created: May 19 2022
Address:
A trencher designed for laying engineering communications (gas pipelines, oil pipelines, water pipelines, sewerage, communication and power lines), as well as for general construction work, cutting slots in frozen soils. Digging width 210 mm. Located in Kyzylorda. In the village of Zhalagash.
№172964 Created: May 19 2022
noname
Was online december 9 2024 11:52